Validate the documented procedure / Design guide for fixtures. Validate the completeness of the drawings, the complete BOM for each fixture, and the release of each tool in the Doc Control System.Score: 0 = Drawings hard to come by, Few part specific fixtures.1 = Drawings created as needed. limited detail. stored in Engineer's hard drive.2 = Documented Requirements & Procedures. Complete Drawing sets, Rev controlled, released for all fixtures, "