Better not to do that. If “Keep frozen” shown on MAWB, PVG station will contact us to confirm the temperature control range of “keep frozen”. It will delay releasing the shipment. Also, the reason we can’t take “temp control requirement” shipment is because PVG doesn’t have enough manpower to handle special requirement shipments. If this shipment is classified as “special requirement” shipment, PVG will need to arrange manpower to handle it, but no one knows how long that will take. CNEE won’t get the shipment until everything is done.