This week, the average daily volume of about 888 vehicles, the average daily soil fill is 9750m3, the total amount of soil filling is 68250m3. As of today, the hotel lot and surrounding area has been backfilled 380,000 m3, backfilling 50% completed, compared to the schedule 9 days ahead of schedule.
正在翻译中..