Finally, this paper will concentrate on the major OT conducted just prior toDOT&E issuing a Beyond Low Rate Initial Production report (B-LRIP).2 This is the point at which a final determination is made regarding resolution of the system’s operational effectiveness and operational suitability. Prior to this point, it is expected (and understandable) that system performance may be somewhat less than desired due to system maturity. Therefore, many of the lessons learned may not be applicable prior to that B-LRIP testing.