The cooling tower is the auxiliary refrigeration equipment of the chilled water system, which provides chilled water for the air conditioner in the computer room. It usually runs in winter (from the end of November to the middle of March of the following year, about 4 months each year), and it has been put into operation since the end of 2014. At present, the main components have reached the replacement cycle (the replacement cycle of driving components such as bearings and shaft sleeves according to the manufacturer is 2 years, and the actual operation time is about 3 years). At present, the vibration of the transmission parts of the fan is too large, some bearings have been damaged, and the pipeline soft joints are aging and leaking. So that the cooling tower chilled water system can't operate normally. According to the manufacturer's suggestion, arrange an overhaul. The overhaul cost is CNY62422.5, DXC needs to pay CNY15867.05 for maintenance, and other expenses are shared by tenants. We plan to use F1165466 cost to complete the overhaul of cooling tower, F1165466 is the work order of UPS battery replacement application and CNY 87,196.17 balance.
正在翻译中..