冷却塔是冷冻水系统辅助制冷设备,给机房空调提供冷冻水,通常在冬季运行(11月底至第二年3月中旬运行,每年大概4个月),从2014年底投入运行的简体中文翻译

冷却塔是冷冻水系统辅助制冷设备,给机房空调提供冷冻水,通常在冬季运行(

冷却塔是冷冻水系统辅助制冷设备,给机房空调提供冷冻水,通常在冬季运行(11月底至第二年3月中旬运行,每年大概4个月),从2014年底投入运行,当前主要部件已到更换周期(厂家指导更换周期:轴承,轴套等驱动部件为2年,实际运行时间大概是3年) 。当前风机传动部件震动偏大,部分轴承已经坏,管路软接头老化,漏水。以至于冷却塔冷冻水系统不能正常运行了。根据厂家建议,安排一次大修。本次大修,大修费用共计CNY62422.5, DXC 需要支付维修费CNY15867.05, 其它费用由租户分摊。我们计划使用F1165466费用来完成冷却塔大修,F1165466是UPS更换电池申请的工单,还有CNY 87,196.17 结余
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
冷却塔是冷冻水系统辅助制冷设备,给机房空调提供冷冻水,通常在冬季运行(11月底至第二年3月中旬运行,每年大概4个月),从2014年底投入运行,当前主要部件已到更换周期(厂家指导更换周期:轴承,轴套等驱动部件为2年,实际运行时间大概是3年) 。当前风机传动部件震动偏大,部分轴承已经坏,管路软接头老化,漏水。以至于冷却塔冷冻水系统不能正常运行了。根据厂家建议,安排一次大修。<br>本次大修,大修费用共计CNY62422.5, DXC 需要支付维修费CNY15867.05, 其它费用由租户分摊。我们计划使用F1165466费用来完成冷却塔大修,F1165466是UPS更换电池申请的工单,还有CNY 87,196.17 结余
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
The cooling tower is an auxiliary refrigeration equipment of the chilled water system, which provides chilled water for the air conditioner in the machine room. It usually operates in winter (about 4 months a year from the end of November to the middle of March of the second year). It has been put into operation since the end of 2014. At present, the replacement cycle of main components has reached the replacement cycle (the manufacturer's guidance replacement cycle: the driving components such as bearings and shaft sleeves are 2 years, and the actual operation time is about 3 years). At present, the vibration of fan transmission parts is too large, some bearings have been broken, the pipeline soft joints are aging and water leakage. So that the chilled water system of the cooling tower can not operate normally. Arrange an overhaul according to the manufacturer's recommendations.<br>For this overhaul, the total overhaul cost is cny62422.5, DXC needs to pay the maintenance cost cny15867.05, and other costs are shared by the tenant. We plan to use f1165466 cost to complete the cooling tower overhaul. F1165466 is the work order applied for UPS battery replacement, and there is a balance of CNY 87196.17
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
The cooling tower is the auxiliary refrigeration equipment of the chilled water system, which provides chilled water for the air conditioner in the computer room. It usually runs in winter (from the end of November to the middle of March of the following year, about 4 months each year), and it has been put into operation since the end of 2014. At present, the main components have reached the replacement cycle (the replacement cycle of driving components such as bearings and shaft sleeves according to the manufacturer is 2 years, and the actual operation time is about 3 years). At present, the vibration of the transmission parts of the fan is too large, some bearings have been damaged, and the pipeline soft joints are aging and leaking. So that the cooling tower chilled water system can't operate normally. According to the manufacturer's suggestion, arrange an overhaul. The overhaul cost is CNY62422.5, DXC needs to pay CNY15867.05 for maintenance, and other expenses are shared by tenants. We plan to use F1165466 cost to complete the overhaul of cooling tower, F1165466 is the work order of UPS battery replacement application and CNY 87,196.17 balance.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: