Problem of reference diagram of super desulfurization reactor:<br>1. The dimension of mixing support is incomplete in the reference drawing<br>(1) thickness of upper head support flange and barrel section, size of support rib plate;<br>(2) size of mixing baffle in the cylinder;<br>(3) the size of the supporting parts of the lower head in the cylinder body is incomplete (the size of the arc plate in A-A, the width and thickness of the three vertical plates in detail 2, and the size of the vertical tube);<br>(4) mixer model, speed and power.<br>2. It is necessary to confirm whether the weight of agent assembly in c3544-d366adstrev2 tender of ag-303 AB data is 5760kg, single weight or two sets of common weight?<br>3. The pipe diameter of 1cn nozzle is Dn40, and the difference between it and the weld is 50 mm measured on the drawing. It is difficult to open the inclined nozzle close to the weld. Can the 1cn nozzle be moved down another 50 mm to avoid the weld?<br>4. According to the calculation of domestic support, the center diameter of outrigger is 2140mm (see the attachment), which is quite different from the foundation value of 2630mm diameter on site.<br>
正在翻译中..