Additional documentsThe Bidder shall submit with its Technical Bid the following additional documents and all requirements:10MW Altai solar PVConstruction technical drawings and drawings of the project, including but not limited to:General layout detailing main equipment, temporary use area during the construction period, access road, security fence, buildings, technical works, tracks, cable trenchesPVsyst production model / reportBuilding Layout drawings & Building characteristicsCertificates of suppliers regarding warranties for main equipmentSingle Line Diagram (System to interconnection point)Control system architecture showing all components of the projectArchitecture of the alarm system and fire protectionSchematic diagram of the telecommunication system, including the interfaces;Diagram of the energy metering system, including the interfacesHealth and safety management plan draft for the construction phase Operational Documentation:Principles of the system / cleaning procedure of PV modulesHealth and safety management plan draft for the operational phaseScope of services Recommended spare parts list