⑵ Bridge<br> (1) Strictly control the temperature of formwork and the temperature difference between concrete and adjacent medium, and take covering measures and watering cooling measures for formwork when necessary.<br> (2) that circulate water pipe provide cooling for mass concrete is used for cool, a curing pool is arranged at the junction of the pier shaft and the bearing platform, and a cooling vent hole is arranged inside the pier shaft. The concrete shall be poured evenly in layers according to the section level, so as to avoid the concentrated emission of hydration heat of concrete, which may lead to cracks in the interior or surface of concrete.<br> (3) ③attach great importance to vibrating operation, it is forbidden to insert the vibrator into the concrete and let it vibrate to ensure the compactness of the concrete.<br> (4) Strengthen curing to ensure the quality of concrete curing.
正在翻译中..