According to the design requirements of "lamp installation large sample map" and the "roadway elevation map" of the construction of the site, the elevation of the relevant points of the mat layer and the surface layer is calculated.<br>Measure the water stability layer and its related point elevation with a level, determine the depth of the pre-buried pipe groove and the height of the pipe port, and fix the point with the steel pile.
正在翻译中..