随着建筑业管理体制改革的深化,工程项目施工管理越来越受到人们的重视,其管理水平的高低成为制约企业生存与发展的第一要素,而质量、进度、成本控制的英语翻译

随着建筑业管理体制改革的深化,工程项目施工管理越来越受到人们的重视,其

随着建筑业管理体制改革的深化,工程项目施工管理越来越受到人们的重视,其管理水平的高低成为制约企业生存与发展的第一要素,而质量、进度、成本控制是其中最为重要的管理要点。本文结合实际情况,对项目的各分部分项工程施工方案进行了详细设计。运用进度控制的基本理论知识,从项目管理者的角度出发,对项目从开工准备到竣工验收全过程进行了系统的进度规划设计,使用横道图和网络图对进度计划进行分析,并根据实际情况提出了具体的保证进度计划实施的措施;质量和安全方面,制定了严格的技术、组织措施,针对施工项目中常见问题、重点问题进行了规划,建立相应的管理组织机构,以保证质量与安全计划得以很好的实现。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
With the deepening of the reform of the construction industry management system, people pay more and more attention to the construction management of engineering projects. The level of its management has become the first element that restricts the survival and development of enterprises, and quality, schedule, and cost control are the most important of them. Management essentials. <br>Based on the actual situation, this paper has carried out a detailed design of the construction plan for each sub-item of the project. Using the basic theoretical knowledge of schedule control, from the perspective of the project manager, systematically planned and designed the project from the start of construction to the completion and acceptance of the project, and analyzed the schedule using the horizontal diagram and network diagram, and based on the actual situation Put forward specific measures to ensure the implementation of the schedule plan; in terms of quality and safety, we have formulated strict technical and organizational measures, planned for common problems and key issues in construction projects, and established corresponding management organizations to ensure quality and safety The plan was well realized.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
With the deepening of the construction system reform, the construction management of engineering projects has been paid more and more attention, and its management level has become the first factor restricting the survival and development of enterprises, and quality, progress and cost control are the most important management points.<br>Based on the actual situation, this paper designs the construction plan of each sub-part of the project in detail. Using the basic theoretical knowledge of progress control, from the point of view of project manager, the project from the start of preparation to completion acceptance of the whole process of systematic progress planning and design, the use of cross-sectional and network maps to analyze the progress plan, and according to the actual situation to put forward specific measures to ensure the implementation of the progress plan; In terms of quality and safety, strict technical and organizational measures have been formulated, the common problems and key problems in construction projects have been planned, and corresponding management organizations have been established to ensure that the quality and safety plan can be well realized.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
With the deepening of the reform of the management system in the construction industry, people pay more and more attention to the construction management of engineering projects. The management level has become the first factor restricting the survival and development of enterprises, and the quality, progress and cost control are the most important management points.<br>In this paper, combined with the actual situation, the detailed design of each part of the project construction scheme is carried out. Using the basic theoretical knowledge of schedule control and from the perspective of project managers, the paper systematically designs the schedule of the whole process of the project from preparation for commencement to completion acceptance, analyzes the schedule with bar chart and network chart, and puts forward specific measures to ensure the implementation of the schedule according to the actual situation; In terms of quality and safety, strict technical and organizational measures have been formulated, common problems and key problems in construction projects have been planned, and corresponding management organizations have been established to ensure the realization of quality and safety plan.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: