With that in mind, a logical course of action could be to install tubes in the space presently occupied by one or both of the two 155mm Advanced Gun Systems (AGS) on each DDG-1000s. The AGSs are autoloading and linked to large magazines that extend well below the deck line, all of which would no longer be necessary if these weapons were removed.