The completion of the AUDIT score reduction plan in June and July is as follows: The completion of the June score reduction plan in the third week of July is 25.7 points, which is 10.9 points lower than the target value, and the target is completed. The score reduction plan in July was 27.1 points in the third week of July, which was 18.17 points higher than the target value, which was not up to the standard. <br>See the table below for specific completion conditions:
正在翻译中..