In order to ensure the calculation accuracy of important parts, different meshing strategies are adopted for different regions of the model, so as to obtain enough accurate calculation results with as little calculation time as possible under the condition of limited computing resources. A small number of columns below the positions of shell, pillar cover plate, U-shaped column, connecting plate and connecting plate are the main analysis areas, and the connecting area of components is the main stress concentration area. Solid elements are used for grid division, shell elements are used for grid division for the lower pillar, and one-dimensional line body elements are used for grid division for railings, and the attributes are set as tension only and compression free, and tension only for elements In the time history analysis, in order to ensure the convergence of the calculation results, the spring is used instead of the pull rod, and the setting of the bearing characteristics is the same as that of the line element.<br>
正在翻译中..