In view of the progress of problem analysis, it is necessary to retain the fault vehicle for analysis.<br>Leave 100% of the fault vehicles before July 24, and inform the external inspection department for analysis<br>The quality department is required to pull the external inspection department to analyze the problems found.<br>Need to retain the vehicle for analysis (traction-4259)<br>The final inspection records the problems and leaves relevant fault vehicles for analysis<br>Analyze the problem of tractor retention<br>Final inspection records are required for wiper arm water pipe and sprinkler hose<br>The quality department is required to pull the external inspection department to analyze the problems found.<br>"Pull the designer to review the connector.<br>"<br>If the batch verification measures are invalid, they need to be re analyzed and formulated.<br>The external inspection department is required to compare the profile of the problem parts according to different suppliers.<br>According to the design requirements, the final assembly is required for one week, and the fixed torque electric tool is used to assemble the steering case as the verification of torque influence.<br>The final assembly is required to implement the torque requirements of steel joint<br>After the trial assembly of the sample has been completed, it is required that the design issue a change order immediately according to the trial assembly status, and require the product to be reformed and reflected before July 31.<br>Technical evaluation on whether WIP can be restructured and the issuing time of the change order shall be made clear<br>
正在翻译中..