本工程止水帷幕密封墙采用双轴粘土搅拌桩工艺。①定位 平整施工场地后,按照桩位平面布置图确定桩位。将搅拌机移至设计桩位,定位对中,桩位放样误差的英语翻译

本工程止水帷幕密封墙采用双轴粘土搅拌桩工艺。①定位 平整施工场地后,按

本工程止水帷幕密封墙采用双轴粘土搅拌桩工艺。①定位 平整施工场地后,按照桩位平面布置图确定桩位。将搅拌机移至设计桩位,定位对中,桩位放样误差小于 50mm,搅拌轴垂直度(每米)允许偏差不超过 15mm。②施工顺序粘土搅拌桩双轴的长轴方向垂直于密封墙的方向,粘土搅拌桩采用从一端 向另一端顺序连续施工。③制浆 泥浆池设置在加固区域边界,采用机械开挖,底部铺上塑料膜跟土工布。粘土帷幕墙渗透系数小于 5*10-6cm/s, 泥浆掺入比根据室内配合比试验,单位 掺入指标为 30%。完工后对泥浆池进行处理,用中粗 砂填平,池内泥浆全部运至密封沟内。④搅拌喷浆下沉 启动电动机和灰浆泵,使搅拌机沿导向架搅拌切土下沉的同时将拌制好的 泥浆压入地基中,边旋转边喷浆,保证 搅拌下沉和喷浆速度是同步的,下沉的 速度不大于 1.2m/min。搅拌深度一般比 设计深度超深 10~20cm,当搅拌至桩端 时,应坐底 30 秒以上,保证浆液完全到 桩端。钻进注浆量约 50~60%。⑤搅拌上升当搅拌头下沉到设计深度,并坐底 30 秒以上后,开始提升,边旋转边喷浆, 提升速度不大于 0.8m/min。搅拌头提升到距桩顶 1m 时,应减速,在喷浆口露 出地面时,应停止提升,搅拌数秒以保证桩头均匀密实。提升注浆量约 20~30%。(6)、再次搅拌喷浆下沉与 4 步骤基本相同,区别是钻进注浆量约 10~20%。(7)、再次搅拌上升与 5 步骤基本相同,区别是提升注浆量月 10~15%。(8)、移位:搅拌机移位,并重复 3、4、5、6、7 步骤。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The water-proof curtain sealing wall of this project adopts biaxial clay mixing pile technology. <br>① positioning <br>formation after the construction site, determined according to the pile pile floorplan. Move the mixer to the designed pile position, <br>position and align , the stake error of the pile position is less than 50mm, and the allowable deviation of the verticality of the mixing shaft (per meter) does not exceed 15mm. <br>② Construction sequence <br>The long axis direction of the two axes of the clay mixing pile is perpendicular to the direction of the sealing wall, and the clay mixing pile is constructed sequentially from one end to the other end. <br>③ pulp <br>mud pit boundary region disposed reinforcement using mechanical excavation, a plastic film covered with geotextile bottom. <br>The permeability coefficient of the clay curtain wall is less than 5 * 10-6cm / s, and the mud mixing ratio is based on the indoor mixing ratio test, and the unit mixing index is 30%. <br>After completion, the mud pool is treated and filled with medium coarse sand, and all the mud in the pool is transported to the sealed trench. <br>④ stirred sink spraying <br>the starter motor and a mortar pump, so that along a stirrer <br>while stirring the guide frame setsudo good mixing and mud will sink into the ground, the spray while rotating, to ensure stirring and spray speed of sinking Simultaneously, the sinking speed is not greater than 1.2m / min. The mixing depth is generally 10 ~ 20cm deeper than the design depth. When stirring to the end of the pile, it should sit at the bottom for more than 30 seconds to ensure that the slurry reaches the end of the pile. Drilling grouting volume is about 50 ~ 60%. <br>⑤ Stirring and rising <br>When the stirring head sinks to the design depth and sits on the bottom for more than 30 seconds, it starts to lift, spraying the slurry while rotating, the lifting speed is not more than 0.8m / min. When the mixing head is raised to 1m from the top of the pile, it should be decelerated. When the spraying hole is exposed to the ground, the lifting should be stopped, and the mixing should be performed for a few seconds to ensure that the pile head is even and dense. Increase the grouting volume by about 20 ~ 30%. <br>(6) The <br>submerged grouting and subsidence are basically the same as the four steps, the difference is that the amount of drilling grouting is about 10 ~ 20%. <br>(7) Stir up again<br>It is basically the same as the 5 steps, the difference is to increase the grouting volume by 10 ~ 15% per month. <br>(8). Shift: The <br>mixer is shifted, and repeat steps 3, 4, 5, 6, and 7.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
The sealing wall of the water-stopping curtain of this project adopts the two-axis clay mixing pile process.<br>(1) Positioning <br>After leveling the construction site, the pile position is determined according to the pile layout plan. Move the blender to the design pile,<br>In the alignment, the pile loft ingress splendor error is less than 50mm, and the verticality of the mixing shaft (per meter) allows a deviation of no more than 15mm.<br>(2) Construction order<br>The long axis direction of the double axis of the clay mixing pile is perpendicular to the direction of the sealing wall, and the clay mixing pile is constructed continuously from one end to the other.<br>(3) Pulp <br>The mud pool is set at the boundary of the reinforced area, with mechanical excavation and plastic film and earthen cloth on the bottom.<br>The penetration coefficient of the clay curtain wall is less than 5 x 10-6cm/s, and the mud doping ratio is based on the indoor fit ratio test, and the unit doping index is 30%.<br>After completion, the mud pool is processed, filled with medium coarse sand, and all the mud in the pool is transported to the sealed ditch.<br>(4) Stirring spray to sink <br>Start the motor and mortar pump so that the blender is along<br>The guide frame stirs the cut soil to sink while pressing the mixed mud into the foundation, rotating the side spray, to ensure that the stirring and sinking and the spray speed is synchronized, the sinking speed is not greater than 1.2m/min. Stirring depth is generally more than the design depth of 10 to 20 cm, when stirring to the end of the pile, should sit at the bottom for more than 30 seconds, to ensure that the slurry is completely to the end of the pile. Drilling into the pulp amount of about 50 to 60%.<br>(5) Stirring up<br>When the mixing head sinks to the design depth and sits at the bottom for more than 30 seconds, start lifting, spinning the side to spray the slurry at no greater than 0.8m/min. When the mixing head is raised to 1m from the top of the pile, it should be slowed down, and when the spray outlet is exposed to the ground, the lift should be stopped and the stirring should be stirred for a few seconds to ensure that the pile head is evenly compact. The amount of raised slurry is about 20 to 30%.<br>6, stir the spray to sink again<br>The difference is essentially the same as the 4 steps, the difference is that the amount of drilling slurry is about 10 to 20%.<br>7, stir again to rise<br>The difference is to increase the amount of pulp 10 to 15% monthly, which is basically the same as the 5 steps.<br>(8), shift:<br>Shift the blender and repeat the 3, 4, 5, 6, 7 steps.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The sealing wall of the water stop curtain of the project adopts the technology of biaxial clay mixing pile.<br>Location<br>After the construction site is leveled, the pile position shall be determined according to the plan layout of pile position. Move the mixer to the design pile position,<br>For positioning and alignment, the setting out error of pile position is less than 50 mm, and the allowable deviation of verticality of mixing shaft (per meter) is not more than 15 mm.<br>② Construction sequence<br>The long axis of the double axis of the clay mixing pile is perpendicular to the direction of the sealing wall, and the continuous construction from one end to the other is adopted for the clay mixing pile.<br>3. Pulping<br>The mud pit is set at the boundary of the reinforcement area, which is excavated mechanically, and the bottom is paved with plastic film and geotextile.<br>The permeability coefficient of clay curtain wall is less than 5 * 10-6cm / s. according to the indoor mix proportion test, the unit mixing index is 30%.<br>After completion, the mud pit shall be treated and filled with medium coarse sand, and all mud in the pit shall be transported to the sealing ditch.<br>④ Mixing and shotcreting sinking<br>Start the motor and mortar pump to make the mixer<br>When the guide frame is agitated and cut into soil and sinks, the mixed mud shall be pressed into the foundation, and the mud shall be sprayed while rotating to ensure that the mixing sinking and spraying speed are synchronous, and the sinking speed shall not be greater than 1.2m/min. Generally, the mixing depth is 10-20cm deeper than the design depth. When mixing to the pile end, the bottom shall be set for more than 30 seconds to ensure that the slurry completely reaches the pile end. The amount of drilling grouting is about 50-60%.<br>⑤ Agitation rise<br>When the mixing head sinks to the design depth and sits at the bottom for more than 30 seconds, it starts to lift and spray while rotating, with the lifting speed no more than 0.8m/min. When the mixing head is lifted to 1m from the pile top, it shall be slowed down. When the shotcrete mouth is exposed to the ground, the lifting shall be stopped and the mixing shall be carried out for several seconds to ensure that the pile head is uniform and dense. The grouting amount is about 20-30%.<br>(6) . mixing and shotcreting again to sink<br>The difference is that the amount of grouting is about 10-20%.<br>(7) . stir again to rise<br>The difference is that the grouting volume is increased by 10-15% per month.<br>(8) , shift:<br>Shift the mixer and repeat steps 3, 4, 5, 6 and 7.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.