There are a total of 59 pieces of the low-temperature superheater pipe system, of which 4 pieces must be welded with protective plates for temperature measurement, and the installation position is as shown in the figure;
The cryogenic superheater tube system a total of 59 pieces, of which 4 pieces must be welded temperature protection plate, installation position according to the illustration;
There are 59 tubes in the low temperature superheater, 4 of which need to be welded with temperature measuring guard plate, and the installation position is as shown in the figure;<br>