Strengthen the management of road-building materials transport vehicles, loose materials are not allowed to be higher than the top of the container; When transporting materials that are easy to fly, cover them with dust-proof soil, and store loose and easy to fly materials where they are located; Clean up the construction site in time, arrange special personnel, special sprinkler to strengthen the cleaning and maintenance of the required machine ploughing road and construction sidewalk, mix with sprinkling water when carrying out embankment construction in dry season, so as to ensure that the material has a certain humidity and avoid dust.
Strengthen the management of road-building materials transport vehicles, loose materials are not allowed to be higher than the top of the container; When transporting materials that are easy to fly, cover them with dust-proof soil, and store loose and easy to fly materials where they are located; Clean up the construction site in time, arrange special personnel, special sprinkler to strengthen the cleaning and maintenance of the required machine ploughing road and construction sidewalk, mix with sprinkling water when carrying out embankment construction in dry season, so as to ensure that the material has a certain humidity and avoid dust.
正在翻译中..