Main road (width): 6 m; weak road condition inside the IENo centralized power plant - weak electricity infrastructure as cables are not well organizedManaged by PT. PDAN – 450 liter per second (lps)Provides Water Treatment Plant (ETP) in collaboration with PT. Tirta Dumai Bersemai and PT. Dumai Tirta PersadaProvides waste disposal and treatmentfor IE and port27,000 tons storage capacityManaged by PT. PDAN – 450 liter per second (lps)Provides Water Treatment Plant (ETP) with 850 m3/hour capacity不可用400,000 tons storage capacity for palm oil products