During the construction of a water protection project, if a river flows through the construction site, it will have a significant impact on the construction period of the project and the use of related technologies, so a scientifically sound formula needs to be developed. diversion plan to improve diversion technology. Implement the impact to achieve the quality of construction of water protection projects. Long-term experimental experience suggests that before implementing diversion technology, construction technicians must carefully and accurately analyze the relevant data according to the characteristics of the changed riverbank, and select the appropriate measurement method to understand the seasonal nature of the river. . According to the changing characteristics, the replacement period of the building is divided accordingly in order to achieve the goal of improving the effectiveness of building control. Given that different water protection projects differ greatly in the construction environment, it is necessary to choose a scheme to change the direction in different geographical environments. First, sufficient materials need to be prepared during construction. Due to the relatively loose soil at the construction site location, long-term construction will lead to drowning and displacement in the river, creating a certain amount of budget and reality. materials to use. difference. Therefore, sufficient material needs to be prepared to be able to provide the material in a timely manner. Second, do a good job of protecting the riverbed to avoid poor quality sluice projects. Third, relevant technicians must take effective action to eliminate and control emergencies that may make the relocation plan more complete.