Recently, a quality inspection department announced that a construction team had serious quality problems in building the castle TESMAL leading TESMAL to be collapsed.However, a manager of the construction team said the material supplier, not the construction team was responsible for the poor quality of the castle TESMAL because the construction team built another castle MONOTONGY that located near the TESMAL but MONOTONGY showed no signs of collapse.