The alternatives for an engineering project to recover most of the energy presently being lost in the primary cooling stage of a chemical processing system have been reduced to three designs. The estimated capital investment amounts and annual expense savings are as follows:Assume that the MARR is 12% per year, the study period is six years, and the market value is zero for all three designs. Apply an incremental analysis method to determine the preferred alternative