After 90 days of supervision, the problems of the lack of fixation of the air pipe of the transmission operator and the air leakage of the high and low gear gas pipe joints have been closed down in this week. Abnormal problems will be upgraded in the 9th Bi weekly quality improvement meeting, and other problems will progress normally.<br>
正在翻译中..