So in 2019 the nitrogen system for monitoring only once tested before production to determine the nitrogen system can provide nitrogen production in line with provisions.
Therefore, nitrogen system monitoring in 2019 is only tested once prior to production to determine that the nitrogen system can provide nitrogen in accordance with production regulations.
Therefore, the monitoring of nitrogen system in 2019 is only conducted once before production to confirm that the nitrogen system can provide nitrogen that meets the production requirements.