The furnace needs to be equipped with SPI equipment, 100% detection of the amount of tin in front of the furnace, 100% inspection of welding conditions by AOI equipment after furnace, and AOI inspectors need to be fully trained to be qualified before they can be put on duty.
正在翻译中..