When the deep and shallow pits are connected, they should first fill the deep pits, to be solidified, flattened and then fully layered with the shallow pits. If the section is filled, it should be handed over and filled in a trapezoid. In the wall base, pipe backfilling, should be on both sides with fine soil at the same time backfilling, solid.
正在翻译中..