After the machine is in place, remove the transportation fastening plates at the front and rear two sets of springs, adjust the bottom of the machine to a level, use anchor bolts to fix the machine on the floor, connect the inlet and outlet pipes, and place the stone collection tube in place.
正在翻译中..