The final inspection shall organize relevant units to analyze the fault vehicle<br>Pull the quality and external inspection to check the assembly process and sub assembly process on the production site. And feedback video.<br>Air leakage found in final inspection 100% feedback leakage video<br>If the air leakage is found in the final inspection, 100% of the leakage video will be fed back, and the fault parts will be replaced for retention analysis<br>According to the structure of the related parts of the toolbox cover plate, the structure of Benz model is analyzed.<br>According to the current situation of the problem, write a page for upgrading, and then transfer responsibility design<br>According to the current situation of the problem, write a page to upgrade, and then transfer the responsibility to purchase<br>Sort out the problems into QC report materials and report them in the 8th improvement biweekly meeting<br>After communicating with the general assembly, sort out the problems into QC report materials and report them in the 8th improvement biweekly meeting<br>It is suggested that the purchasing department should organize the technical center, quality and manufacturing to hold a special meeting to review the status of parts and components, and jointly formulate improvement plans.<br>
正在翻译中..