Construction electricity from the designated power supply of Party A access to the site temporary power distribution room, temporary electricity on site using a three-phase five-wire system. According to the provisions of the temporary electricity design at the construction site, the project selects the three-phase five-wire system as the temporary electricity system for the construction of the project, that is, the TN-S system, to ensure the safety of electricity consumption by repeated grounding.
正在翻译中..