(3) In the cases referred to in paragraph (1) of this Article, the investor shall be obliged to provide approval for use for the buildings of the first category, ie report for performed technical inspection from supervising engineer in which it is concluded that the building can be put to use for the buildings of the second category, within two years from the preparation of a positive report for temporary use of the building.