For a given Product check if :1- Actual Customer demand is linked to the MPS.2- Check on one example whether the MPS is realistic vs Actual Operational Equipment Efficiency (OEE).3- Check if MPS (Master Production Schedule) is covering a period longer than the longest sub-component leadtime.LEVEL 1: none of the above criteriaLEVEL 2: Condition 1 & 2 are statisfied.LEVEL 3: All 3 conditions are met.