This afternoon, Mr.Chieng and I met with the person in charge of the Laku and held a meeting. There are two suggestions for us.1. The owner of the land applies for water (i.e. BPSB).2. Open two water intake outlets, one 1 inch and the other 3 inches, on the main water pipe and install two water meters respectively.What we will prepare to do is that 1. Mr.Chieng will submit the revised drawings to the water plant.2. Prepare two water pipes at the junction of the filling station to connect the water supply pipes of the water plant.