In l079a001, it is the flue gas pipeline from the second boiler pk790 / 791 to the flue gas quench settling chamber mc720 / 721, and the drawings of refractory lining are not marked. Is it through kl710 / 711tcv01 mixed with cold flue gas to cool down immediately? What is the temperature to be controlled in this flue gas pipeline? Below 300 ℃? If it is considered that the mixed air control valve is out of control, whether it is necessary to consider the refractory lining of the flue gas pipeline. Please reply.<br>
正在翻译中..