c)Test cycle:i.According to figure 2, after 45min pre-conditioning, the test phase shall be changed to condensation phase (during this phase, the ambient temperature of the chamber shall be controlled by heating the water in the bath/floor trough. The temperature difference between the water bath and the ambient temperature of the chamber must always be