1. Increase the moisture absorption time of the product<br>2. Shorten the drying time of raw materials, the original 5H shortened to 4H<br>3. The injection molding temperature was changed from 285 degrees to 278 degrees<br>The first few wholesale goods with the same batch of raw materials, chemical composition qualified
正在翻译中..