Filling and emptying the Solvent Drum, D-2410 is a manual operation and requires the presence and attention of the Field Operator for the entire process.In the next steps the Solvent Drum will be filled to 50% level. Next, the Solvent Pumps will be commissioned to inventory cumene to the OEC and SCWC and completing the circulation circuit back to the Solvent Drum.