9.5.2 Disposal measures of solid waste during construction period The solid wastes during the construction period of this project are mainly domestic wastes of constructors and construction wastes. During the construction process, all kinds of garbage should be piled up and treated by classification. All wastes should be piled up in the specified place in time. It is forbidden to pile up and dump at will. In addition, it is necessary to clean up and recycle the waste in the stacking place in time to avoid messy and other phenomena. Domestic garbage in the factory area mainly includes paper, waste packaging materials, food residue and other domestic garbage generated by construction workers in their daily life. Adopt fixed-point centralized collection, which shall be handled uniformly by the outsourcing unit. Construction waste generated in the construction process belongs to general solid waste, which should be collected in time, and recycled for use. Other construction wastes without recycling value shall be collected and handled uniformly by the outsourcing unit. Metal wastes, such as leftover bits and pieces and welding heads, generated during the construction process are not randomly discarded at the construction site. Each welding operation point is equipped with tietong or cardboard box to collect metal wastes. After the completion of the construction, the relevant units of the outsourcing commission will uniformly and centrally recycle and dispose of them. 9.6 conclusion of environmental impact during construction period During the construction period of this project, the atmospheric pollution sources are mainly construction dust and tail gas of construction equipment, the generated wastewater is mainly domestic sewage and construction wastewater, and the generated solid wastes are mainly domestic garbage, construction garbage and main noise pollution sources. Noise of construction machinery and tools and noise of transport vehicles. The production wastewater and domestic sewage during the construction period of this project are pretreated and discharged to the park sewage treatment plant for treatment. Domestic waste and construction waste during the construction period should be piled up and managed in different categories. Construction domestic waste will be uniformly handled by the outsourcing unit, construction waste will be collected in time, recyclable waste will be recycled, and garbage with no recycling value will be uniformly handled by peripheral units. For the noise during the construction period of this project, we should strengthen the construction management and strictly control the operation time, especially at night.
正在翻译中..