9.5.2 施工期固体废物处置措施本项目施工期固体废物主要为施工人员的生活垃圾和施工建筑垃圾。在施工过程中, 应对各类垃圾分类堆放、分类处理的英语翻译

9.5.2 施工期固体废物处置措施本项目施工期固体废物主要为施工人员的

9.5.2 施工期固体废物处置措施本项目施工期固体废物主要为施工人员的生活垃圾和施工建筑垃圾。在施工过程中, 应对各类垃圾分类堆放、分类处理,所有废物应及时堆放在规定的地点,禁止乱堆乱放、 随便倾倒。另外,要及时清理、回收堆放处的废物,避免出现脏乱等现象。厂区施工中生活垃圾主要为施工人员日常生活中产生的纸张、废包装材料、食物残 渣等生活垃圾。采用定点集中收集,由外委单位统一处理。施工过程产生的建筑垃圾属一般固体废物,应及时收集,可再生利用的进行回收利 用;其它无回收利用价值的建筑垃圾,由外委单位统一收集处理。对施工过程产生的边 角料、焊头等金属类废弃物,在施工现场不随意丢弃,每个焊接作业点配备铁通或纸箱, 收集金属类废弃物,施工结束后外委相关单位统一集中回收处置。9.6 施工期环境影响结论本项目施工期阶段,大气污染源主要为施工扬尘和施工设备尾气,产生的废水主要 为生活污水和施工废水,产生的固体废物主要为生活垃圾和施工垃圾、主要噪声污染源 为建筑机械工具噪声和运输车辆噪声。本工程施工期的生产废水、生活污水经预处理后排至园区污水处理厂处理。对于施工期的生活垃圾和建筑垃圾,应分类堆放和管理,施工生活垃圾将外委单位 统一处理,建筑垃圾及时收集,可再生利用的进行回收利用,无回收利用价值的垃圾由 外围单位统一处理;对于本工程施工期噪声,应加强施工管理,严格控制作业时间,特 别是夜间施工作业。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
9.5.2 Solid waste disposal measures during the construction period The solid waste during the construction period of <BR>this project is mainly the domestic garbage of the constructors and construction waste. During the construction process, various types of garbage should be stacked and treated separately. All wastes should be stacked in a timely manner at the specified location, and random stacking and dumping are prohibited. In addition, it is necessary to clean up and recycle the waste in the stacking place in time to avoid messiness and other phenomena. <BR>The domestic waste during the construction of the plant is mainly the domestic waste generated by the construction workers in daily life, such as paper, waste packaging materials, and food residues. It adopts fixed-point centralized collection and is handled by the external commission unit. <BR>The construction waste generated during the construction process is general solid waste and should be collected in time, and the recyclable waste should be recycled; other construction waste with no recycling value should be collected and processed by the outsourcing unit. Metal wastes such as leftovers, welding heads, etc. generated during the construction process are not randomly discarded at the construction site. Each welding operation site is equipped with iron or cardboard boxes to collect metal wastes. After the completion of the construction, the relevant units of the foreign commission will collectively recycle and dispose of them. <BR>Environmental Impact Conclusion 9.6 construction period <BR>of the project construction period phase, air pollution mainly for construction dust and construction equipment exhaust, waste water produced mainly for domestic sewage and construction waste, solid waste generated mainly domestic garbage and construction waste, the main source of noise pollution <BR>is Noise from construction machinery and vehicles and noise from transportation vehicles. <BR>The production wastewater and domestic wastewater during the construction period of this project are pretreated and discharged to the wastewater treatment plant in the park for treatment. <BR>Domestic waste and construction waste during the construction period should be stacked and managed separately. Construction domestic waste will be processed by the outsourcing unit. Construction waste will be collected in time. Recyclable waste will be recycled. Waste with no recycling value will be handled by peripheral units. ; For the noise during the construction period of this project, construction management should be strengthened, and the operation time should be strictly controlled, especially the night construction operation.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
9.5.2 solid waste disposal measures during construction<BR>The solid waste during the construction period of the project is mainly the domestic waste of construction personnel and construction waste. During the construction process, all kinds of wastes shall be stacked and treated by classification. All wastes shall be stacked in the specified place in time. It is forbidden to pile and dump randomly. In addition, the waste at the stacking place shall be cleaned and recycled in time to avoid dirt and disorder.<BR>The domestic waste during the construction in the plant area is mainly the paper, waste packaging materials, food residues and other domestic waste generated in the daily life of the constructors. Fixed point centralized collection shall be adopted, which shall be handled by the outsourcing unit.<BR>The construction waste generated during construction is general solid waste, which shall be collected in time and recycled if renewable; Other construction wastes without recycling value shall be collected and disposed of by the outsourcing unit. Scrap materials, welding heads and other metal wastes generated during the construction process shall not be discarded at the construction site. Each welding operation point shall be equipped with iron links or cartons to collect metal wastes. After the construction is completed, relevant outsourcing units shall uniformly recycle and dispose them.<BR>9.6 conclusion of environmental impact during construction<BR>During the construction period of the project, the air pollution sources are mainly construction dust and construction equipment tail gas, the wastewater generated is mainly domestic sewage and construction wastewater, and the solid waste generated is mainly domestic garbage, construction garbage and main noise pollution sources<BR>Noise of construction machinery tools and transport vehicles.<BR>The production wastewater and domestic sewage during the construction period of the project are discharged to the sewage treatment plant in the park for treatment after pretreatment.<BR>Domestic waste and construction waste during the construction period shall be stacked and managed by categories. Construction domestic waste shall be uniformly disposed of by outsourcing units, construction waste shall be collected in time, renewable waste shall be recycled, and waste without recycling value shall be uniformly disposed of by peripheral units; For the noise during the construction period of the project, the construction management shall be strengthened and the operation time shall be strictly controlled, especially the construction at night.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
9.5.2 Disposal measures of solid waste during construction period The solid wastes during the construction period of this project are mainly domestic wastes of constructors and construction wastes. During the construction process, all kinds of garbage should be piled up and treated by classification. All wastes should be piled up in the specified place in time. It is forbidden to pile up and dump at will. In addition, it is necessary to clean up and recycle the waste in the stacking place in time to avoid messy and other phenomena. Domestic garbage in the factory area mainly includes paper, waste packaging materials, food residue and other domestic garbage generated by construction workers in their daily life. Adopt fixed-point centralized collection, which shall be handled uniformly by the outsourcing unit. Construction waste generated in the construction process belongs to general solid waste, which should be collected in time, and recycled for use. Other construction wastes without recycling value shall be collected and handled uniformly by the outsourcing unit. Metal wastes, such as leftover bits and pieces and welding heads, generated during the construction process are not randomly discarded at the construction site. Each welding operation point is equipped with tietong or cardboard box to collect metal wastes. After the completion of the construction, the relevant units of the outsourcing commission will uniformly and centrally recycle and dispose of them. 9.6 conclusion of environmental impact during construction period During the construction period of this project, the atmospheric pollution sources are mainly construction dust and tail gas of construction equipment, the generated wastewater is mainly domestic sewage and construction wastewater, and the generated solid wastes are mainly domestic garbage, construction garbage and main noise pollution sources. Noise of construction machinery and tools and noise of transport vehicles. The production wastewater and domestic sewage during the construction period of this project are pretreated and discharged to the park sewage treatment plant for treatment. Domestic waste and construction waste during the construction period should be piled up and managed in different categories. Construction domestic waste will be uniformly handled by the outsourcing unit, construction waste will be collected in time, recyclable waste will be recycled, and garbage with no recycling value will be uniformly handled by peripheral units. For the noise during the construction period of this project, we should strengthen the construction management and strictly control the operation time, especially at night.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: