The concrete should be poured in layers, and the thickness of each layer should meet the requirements of the design code. Each section and each layer should be connected to each other, each section is 2-3m long, so that it is advanced step by step, and pay attention to fill the corners of the formwork with concrete first, and then pour the middle part.
正在翻译中..