1.4 according to the daily production capacity of the machine and the production situation of the previous and subsequent batches, the material distribution staff shall first confirm that the specification of the bare product is consistent with the process card, and then send it to the corresponding machine together with the rubber hose. (for high-pressure products, the operator shall take the flow card to the hose warehouse to collect the hose)<br>
正在翻译中..