The establishment of the fill bank will mainly involve paving the area around site entrance and major access road, setting up of the Construction and Demolition Material Sorting Facilit, construction of barging point, site fencing and temporary stormwater system. It is therefore expected that the noise impact during establishment stage will not be significant. In addition, the proposed site is separated from the planned residential developments at Areas 85 and 86 by the Tseung Kwan O Industrial Estate. The nearest residential areas are the Island Resort and Fullview Garden at Siu Sai Wan as shown on Plan No. P20164-26B. These residential developments are about 1.8 km from the western site boundary. No adverse noise impact is therefore expected.