Please note that by mistake I indicated the height of the installation of the cooling tower at +250 mm. The correct height of installation of the cooling tower is +2500 mm from the gorund. I apologize for the mistake.For electrical part, the original design has one feeder for one fan at 15 kW. Now with two fans, it will be necessary to install two relays and protections (one for each fan) in the MCC (which is already at site). We’ll provide later the updated electrical scheme and instructions for the modification which will be done at site during electrical installation.