wind, bathymetry etc.2 Is third party vessels restricted to enter the siteII Detailed scope of works1 the firefighting, security measures, lighting protection etc.2 Marine traffic management plan/Marine coordination plan3 vessel charter arrangement4 MWS guideline/final and detailded scope of work/experience of MWS memberIII Contractor details and Make and model of critical equipment1 WTG type certification2 anti-lightning system level of the turbine3 Fire protection system for WTG4 Maximum design speed for WTG5 Will the WTGs equipped with Condition Monitoring System(CMS) upon operation6 Cable installation vessel and its track record