Materials: the traditional material management mode is a set of management mode formulated by relevant personnel according to experience or inaccurate data, combined with the actual situation of the construction site. In any project, the property that materials are not suitable for management is because the construction site is huge, complex and changeable. Any deviation or error in material measurement, or lax material submission and review, will cause a large amount of material on-site backlog. Supply is greater than demand, but it has already taken up capital, so it has increased cost invisibly. Based on BIM Technology, material management can realize accurate calculation and timely update of material information. If the construction plan or construction procedure of a construction node changes, all procedures related to the node will be updated automatically in the model system at the same time, and the purchase of raw materials and equipment in the construction plan corresponding to the node will also be updated. In this way, the material supplier can also receive relevant information in a timely manner. Because the material supplier can timely understand the accurate material demand plan and make the logistics plan, it will arrange the materials to enter the site at a suitable time to minimize the backlog of materials on site, so as to control the cost invisibly.<br>
正在翻译中..