Please find attached process QCR0621342, for implementation at your la的英语翻译

Please find attached process QCR062

Please find attached process QCR0621342, for implementation at your labs no later than June the 1st. It requires a temporary deviation affecting to CI-10004, current test method for the hardness shore D and breaking strength adhesion on adhesive (joint strength on laminate test). This deviation has been requested by Engineering.Instructions on how to proceed are detailed in the QCR, and next week we will be having sessions to explain and clear doubts.To summarize, the deviation consists on:- Prepare 2 specimens per sample as current procedure states.- After the time specified in CF-10002 or MS-00147/A3, take out of the isolation box only one specimen.- Test this specimen for shore D and joint strength on laminate, and proceed as per instructions below:o If first specimen tests fulfill specs as per MS-00147/A3 (see table below), then take out the second specimen and test it.o If first specimen tests do not fulfill specs as per MS-00147/A3, leave second specimen into the isolation box for 60 minutes in the case of GT-60, and 30 minutes in the case of GT-50.o After the specified time, second specimen out of the isolation box and get it tested for shore D and joint strength on laminate test.o If second specimen tests comply with specifications in MS-00147/A3 for shore D and joint strength on laminate test, the batch can be approved respective to these both tests.o If second specimen tests results are out of specifications in MS-00147/A3 for one or both tests, then raise material QCR.
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Please find attached process QCR0621342, for implementation at your labs no later than June the 1st. <br><br>It requires a temporary deviation affecting to CI-10004, current test method for the hardness shore D and breaking strength adhesion on adhesive (joint strength on laminate test). This deviation has been requested by Engineering.<br><br>Instructions on how to proceed are detailed in the QCR, and next week we will be having sessions to explain and clear doubts.<br><br>To summarize, the deviation consists on:<br>- Prepare 2 specimens per sample as current procedure states.<br>- After the time specified in CF-10002 or MS-00147/A3, take out of the isolation box only one specimen.<br>- Test this specimen for shore D and joint strength on laminate, and proceed as per instructions below:<br>o If first specimen tests fulfill specs as per MS-00147/A3 (see table below), then take out the second specimen and test it.<br>o If first specimen tests do not fulfill specs as per MS-00147/A3, leave second specimen into the isolation box for 60 minutes in the case of GT-60, and 30 minutes in the case of GT-50.<br>o After the specified time, second specimen out of the isolation box and get it tested for shore D and joint strength on laminate test.<br>o If second specimen tests comply with specifications in MS-00147/A3 for shore D and joint strength on laminate test, the batch can be approved respective to these both tests.<br>o If second specimen tests results are out of specifications in MS-00147/A3 for one or both tests, then raise material QCR.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Please find attached process QCR0621342, for implementation at your labs no later than June the 1st. <br><br>It requires a temporary deviation affecting to CI-10004, current test method for the hardness shore D and breaking strength adhesion on adhesive (joint strength on laminate test). This deviation has been requested by Engineering.<br><br>Instructions on how to proceed are detailed in the QCR, and next week we will be having sessions to explain and clear doubts.<br><br>To summarize, the deviation consists on:<br>- Prepare 2 specimens per sample as current procedure states.<br>- After the time specified in CF-10002 or MS-00147/A3, take out of the isolation box only one specimen.<br>- Test this specimen for shore D and joint strength on laminate, and proceed as per instructions below:<br>o If first specimen tests fulfill specs as per MS-00147/A3 (see table below), then take out the second specimen and test it.<br>o If first specimen tests do not fulfill specs as per MS-00147/A3, leave second specimen into the isolation box for 60 minutes in the case of GT-60, and 30 minutes in the case of GT-50.<br>o After the specified time, second specimen out of the isolation box and get it tested for shore D and joint strength on laminate test.<br>o If second specimen tests comply with specifications in MS-00147/A3 for shore D and joint strength on laminate test, the batch can be approved respective to these both tests.<br>o If second specimen tests results are out of specifications in MS-00147/A3 for one or both tests, then raise material QCR.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
请参阅随附的过程QCR0621342,以便不迟于6月1日在您的实验室实施。<br>它需要一个临时的偏差,影响到CI-10004,目前的试验方法,硬度邵尔D和断裂强度胶粘剂的附着力(联合强度层压试验)。此偏差已由工程部提出要求。<br>关于如何进行的说明在质量控制报告中有详细说明,下周我们将举行会议解释并澄清疑问。<br>总而言之,偏差包括:<br>-按照当前程序规定,每个样品制备2个试样。<br>-在CF-10002或MS-00147/A3规定的时间后,从隔离箱中只取出一个试样。<br>-在层压板上测试该试样的肖氏D和接头强度,并按照以下说明进行:<br>o如果第一个试样试验符合MS-00147/A3(见下表)的规范,则取出第二个试样并进行试验。<br>o如果第一个试样试验不符合MS-00147/A3规定的规格,对于GT-60,将第二个试样放在隔离箱中60分钟,对于GT-50,将第三个试样放在隔离箱中30分钟。<br>o规定时间后,将第二个试样从隔离箱中取出,并在层压试验中进行肖氏硬度和接头强度试验。<br>o如果第二次试样试验符合MS-00147/A3中有关层压板肖氏硬度和接头强度试验的规范,则该批试验可分别通过这两项试验。<br>o如果一次或两次试验的第二个试样试验结果超出MS-00147/A3中的规范,则提高材料质量控制率。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: