5, the product section size, span, and other parameters; <br>6, external load and the size of the product required a clear commitment; <br>7, stacking distance transport of goods and space installation site about how much; <br>8, outdoor installation of temporary office site, stacker, duty to provide integrated building or construction side of the house owned by Party
正在翻译中..