Introduction to the project<br>The project aims to create a large-scale integrated industrial park with new energy vehicles as the core, including auto parts processing and manufacturing and surrounding industries, covering an area of 108,000 square meters, including production workshops, warehouses, offices, talent apartments, business hotels, product centralized display centers, commercial catering and so on. (Note: 1. 163 mu x 666.667 square meters x 108,000 square meters. 2. There are 4 plants, each 2400 square meters, a total of 9600 square meters, another: only do a good job of the girders of about 10,000 square meters, the total construction area of about 20,000 square meters. )<br>The total investment of the project was US$63.49 million. Of which the project cost of US$47.6 million, the other cost of construction was US$15.89 million (including: pre-project consulting fee, engineering survey, design fee, project supervision fee, construction period interest, etc.) ;( note: based on the total investment of RMB400 million, the current exchange rate is calculated at RMB6.3 to the US dollar, the project cost accounts for 75% of the total investment, the other accounts for 25%<br><br>Financing<br>According to the nature of the project investment, the project construction is financed by project capital and bank loans.
正在翻译中..