根据以上的作业划分,A工程项目被划分为单项级作业、单位级作业中心、分部级作业、分项级作业四个作业层次,是根据项目实际情况从整体到细节的划分。的英语翻译

根据以上的作业划分,A工程项目被划分为单项级作业、单位级作业中心、分部

根据以上的作业划分,A工程项目被划分为单项级作业、单位级作业中心、分部级作业、分项级作业四个作业层次,是根据项目实际情况从整体到细节的划分。单项施的重点管理对象”。将整个项目分解到不同的作业层次后,在各个层次的作业中心指定责任人,将成本控制落实到个人,可以提高全体员工的成本管控意识。同时,作业的划分这种方式既能很清晰的计算和了解到各个分项的实际成本,也能为总成本的汇总降低难度,保证得到成本数据准确可靠。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
According to the above division of operations, Project A is divided into four levels of operations: single-level operations, unit-level operations centers, division-level operations, and sub-item-level operations, which are divided from the overall to the details according to the actual situation of the project. The key management object of a single project". After decomposing the entire project into different operation levels, designate responsible persons in the operation centers at each level, and implement cost control to individuals, which can improve the cost control awareness of all employees. At the same time, the division of operations This method can not only clearly calculate and understand the actual cost of each sub-item, but also reduce the difficulty of summarizing the total cost and ensure that the cost data obtained is accurate and reliable.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
According to the above job classification, Project A is divided into four job levels: single item level job, unit level job center, sub item level job, and sub item level job. It is based on the actual situation of the project from overall to detailed division. Key management targets for individual projects. After decomposing the entire project into different levels of work, assigning responsible persons to each level of work center and implementing cost control to individuals can improve the cost control awareness of all employees. At the same time, the division of homework in this way can not only clearly calculate and understand the actual costs of each sub item, but also reduce the difficulty of summarizing the total cost, ensuring accurate and reliable cost data.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
According to the above operation division, Project A is divided into four operation levels: single-level operation, unit-level operation center, ministerial-level operation and sub-level operation, which are divided from the whole to the details according to the actual situation of the project. The key management object of single application ". After decomposing the whole project into different operation levels, assigning responsible persons in operation centers at all levels and implementing cost control to individuals can improve the awareness of cost control of all employees. At the same time, the division of activities can not only clearly calculate and understand the actual cost of each sub-item, but also reduce the difficulty of summarizing the total cost and ensure the accuracy and reliability of the obtained cost data.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: