First, pre-stressed bridge construction<br>Pre-stressed bridges can be broadly divided into treatment roadbeds from the construction procedures, set up brackets, mounts, bracket pre-archsetting settings, production installation templates, bracket pre-pressure, installation of steel, bellows, steel strands, concrete construction, pre-stressed pull, hole pulp, anchoring, demolition, bracket template such a construction step.<br>1, treatment of the foundation, set up bracket support and bracket pre-archsetting setting: the usual foundation treatment scope includes the upcoming construction of the bridge span and bridge width of the overall range. On the foundation treatment, the first step is to completely level the area of the construction bridge and crush it up to the prescribed data standard. Then backfilling the ground elevation from the box beam base elevation to the required height, backfilling bridge elevation each reached the corresponding high value, to ensure that the bracket in the construction remains firm. After the foundation is backfilled, the drainage channel is dug. Bracket more use four-body zigzag double structure arrangement, the bottom pad on the horizontal square stone wood and with the ground between the paving stone chips to level, between the bracket with steel pipe to cross the door frame, the inside and outside are used steel pipe as scissors support, at the same time to use the wire rope symmetrical pull to fix, and in the box beam ribs, cross-divider encryption bracket, At the cantilever plate, some can be reduced appropriately. After laying square wood on the top shelf, further adjust the height of the mounting bracket, adjust the pre-arching degree by using the upper support, and then accurately measure the center point position of the support with the meridian on the column and the table, and install the mount according to the design requirements. According to the pre-arching calculation formula: f-f1-f2, the beam's cross-middle position set the maximum value, according to the parabola form of distribution, calculate the pre-archvalue value of each point, through the adjustable wire rod top or base on the bracket to further fine-tune the bottom mold.<br>2, the production of installation template, bracket pre-pressing and installation of rebar, bellows, steel strands: after the completion of the mount installation, in accordance with the size of the drawings to process and install the box beam bottom template, template seam embedded sponge strip, set oblique support, pressure feet. Before installation, careful examination of the template for deformation or contamination, while ensuring that the height of the box beam sits conforms to the design standards. Remove the sandbag after the pre-pressure is complete, clean the template to paint the release agent, measure the elevation again and adjust the base plate. After the bracket is set up, the bracket is pre-pressured, the load regulation is not less than 1.2 times the weight of the beam reinforced concrete, to ensure that the load distribution is consistent with the weight distribution of the current pouring box beam, set up enough observation points, in strict accordance with the requirements of loading and unloading three times loading and unloading, pre-pressure time to ensure that each observation point in the process of adding and unloading to be observed, To ensure that the observation results are within the specified technical values, it can be considered that the foundation subsidence is basically stable.<br>3, the installation of rebar, bellows, steel strands and concrete construction: adjust the bottom plate, in accordance with the operating provisions of the reinforced steel twice, and then the bellows, steel strands installed, after completion of the rib plate steel. Rebar, bellows, steel strands are disposed of to enter the concrete mixing, pouring and health links. The ingredients are strictly controlled and stirred according to the ratio of the crucible. Box beam concrete is poured twice, the bottom plate, ribbed concrete is poured from low to high, the second layer of concrete from the middle to the two sides evenly paved to the design height, and from low to high. The use of plug-in vibrator stoicism, the use of covering health.<br>4, pre-stressed tensile and hole-way pressure pulp: concrete strength reached 95% of the design strength, and the age period is greater than 7 days after the tensile, in the case of ensuring that the equipment is not fault-free, the steel beam pull in accordance with the design drawings provided by the pull order and pull control stress, the detection process to cooperate with each other, serious operation and do a good job of the relevant records. In order to avoid pre-stressed rib rust, after applying pre-stress, as early as possible to carry out the hole-channel pulp, pulp using the specified cement, to ensure that the aging period is not exceeded, cement slurry than the standard, cement mud consistency control is appropriate. The temperature should be paid attention to during the pulping process and in strict accordance with the operating procedures.<br>5, anchor and bracket, template removal: when the grouting is completed, the exposed part of the anchor to clean, the end of the concrete chisel tied to the steel. Anchor after the steel mesh and reserved rebar spot welding, and then install the template, pouring concrete, pulp seal anchor, to be pressed to 80% of the strength, remove the top frame, in the pulp strength of 90% and after the completion of the anchor to remove all brackets. When removing the bracket, the weigh-in is evenly removed from the middle, so that the weight of the bridge is symmetrical, evenly borne by the two ends of the support average, while preventing the box beam due to uneven force cracks.
正在翻译中..