According to the relevant provisions of the current survey specifications and the characteristics of the project, the methods of drilling and soil sampling, standard penetration test, static penetration test and indoor geotechnical test are adopted in the survey.<br>There are 6 exploration holes arranged in this time, including 3 soil sampling + standard penetration holes, 3 static penetration holes, and the hole depth is 60m. The layout of exploratory holes is shown in the plan of buildings and exploratory points.
正在翻译中..