The rationality of the production layout directly affects the transportation efficiency of the material, taking The A product as an example, from the raw material shipping to the storage of the product, through the casting area, milling area, drilling area, boring area and processing center and other areas, but the unreasonable distribution of the various areas in the workshop causes the transport ation line staggered back and forth, especially at the warehouse is more complicated, It directly leads to congestion and stagnation of the material at the port. In addition, the product's process diagram can be seen, by the adjacent equipment area is not strong lying, And the distance between the associated equipment area is far (especially the distance between the warehouse and the last process processing center is 87.5 meters), the distance of the material handling reached 412.3 meters, the longer handling line caused a larger amount of handling, the material in the process does not produce any added value, belongs to non-value-added activities, handling is a waste, but the production process is a waste, but the production process Indispensable, so to solve this problem, the key lies in the reasonable layout of the workshop facilities.
正在翻译中..