This figure shows the arrangement of FIG facilities One furnace slag, furnace slag II facilities are arranged symmetrically along the center line of both furnaces.
This diagram represents the layout of the no. 1 furnace slag removal facility, and the no. 2 furnace slag removal facility is arranged symmetrically along the center line of the two furnaces. ...
This drawing shows the layout of slag removal facilities of boiler 1. The slag removal facilities of boiler 2 are symmetrically arranged along the center line of the two boilers.<br>